Package Unit Repairs & Replacement
Project Overview
This project focused on repairing and replacing a rooftop package unit serving a section of a shopping mall. The existing unit showed signs of wear and reduced efficiency, affecting temperature control in common areas and tenant spaces. The objective was to restore dependable performance with minimal disruption.
Categories
-
Clients:
Marvin McKinney
-
Category:
Conditioning Replacement
-
Date:
12 May, 2024
Key Considerations
Rooftop access, structural support, and coordination with existing duct connections were critical factors. Our team ensured the unit was properly secured, weather-sealed, and calibrated for continuous commercial operation.
Final Result
The upgraded package unit now provides consistent airflow and reliable temperature control across the served areas. After final testing, the system was optimized for long-term performance, supporting a comfortable environment for shoppers and tenants.