Package Unit Repairs & Replacement

Project Overview

This project focused on repairing and replacing a rooftop package unit serving a section of a shopping mall. The existing unit showed signs of wear and reduced efficiency, affecting temperature control in common areas and tenant spaces. The objective was to restore dependable performance with minimal disruption.

Categories

  • Clients:

    Marvin McKinney

  • Category:

    Conditioning Replacement

  • Date:

    12 May, 2024

Gallery Image
Gallery Image

Key Considerations

Rooftop access, structural support, and coordination with existing duct connections were critical factors. Our team ensured the unit was properly secured, weather-sealed, and calibrated for continuous commercial operation.

Gallery Image
Gallery Image
Gallery Image

Final Result

The upgraded package unit now provides consistent airflow and reliable temperature control across the served areas. After final testing, the system was optimized for long-term performance, supporting a comfortable environment for shoppers and tenants.

Prev Project

Next Project